01/21/10: Our First Walk Through!


On Monday January 11, Pankow, our contractors, took the Teen Task Force on a tour of the pre-construction building. The previous week, Sterling Environmental, one of our demolition contractors, removed all of the drywall, ceiling and floor tiles, and basically everything else that had made up the interior of the old PG&E payment Center.

When I first walked in, I noticed that there were no longer and walls or doors, it was just one big empty room. The tiles were gone, the walls were just cement, and there were huge holes in the ceilings! The room seemed very empty, and pretty large. We even were lucky enough to climb a ladder to the second floor (the stairs have been removed) and look around. On the 2nd floor, there were a bunch of holes in the ceilings and very few walls. Overall, the experience was really neat to be able to see the building in its demolition phases. I can’t wait to see what it looks like at the next walk through!

No comments:

Post a Comment